Power UNITS FOR DOUBLE-SCISSORS LIFT

Common Description
Equipped with the zero leak bidirectional checking sole-noid valves, this electrical power unit is built for your operation of two independent circuits. Which are respectively to the key and subordinate platforms in the double scissors lift. Two cut-off valves are applied for reducing the machine manually in situation of power loss. If more independent circuits are required to your application please get in touch with us for availability.
Remark: 1. Please check with our revenue engineer to the unique pump displacement, motor energy or tank capability.
2. CSA or UL certified motors can be found on request.
Distinctive Notes
1. The AC motor is of S3 duty cycle, which could only operate intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
two. Clean each of the hydraulic elements concerned in advance of installation of the electrical power unit.
3. Viscosity in the oil shoud be 15~46 cst,as well as the oil must be clean and free of charge of impurities,N46 hydraulic oil is suggested.
4. The power unit really should be mounted vertically.
5. Check the oil level within the tank right after the preliminary running with the power unit.
six. Oil modifying is needed following the first one hundred operation hours,afterwards when every single 3000 hours.